Views: 0 Author: Site Editor Publish Time: 2025-01-18 Origin: Site
Annual 200,000-ton Cold Chain Food Production Project, Building No. 1 and No. 2 Low-temperature Processing Workshop Project, adopts a structural form of steel structure + reinforced concrete structure. The total construction area of the low-temperature workshops is 32,404.29㎡. Among them, the construction area of Building No. 1 Low-temperature Processing Workshop is 17,611.34㎡, with a length of 132.5m, a width of 63m, and a height of 23.95m; the construction area of Building No. 2 Low-temperature Processing Workshop is 14,792.95㎡, with a length of 108m, a width of 63m, and a height of 23.95m. After the project is put into production, it will become an important functional facility of the city's "vegetable basket" project and urban material security system, as well as a storage and distribution center for daily consumer goods.