Inner Mongolia Huayi Zhuozi Thermal Power Co., Ltd. Coal Yard Dust Control Project Construction And Installation Section Name: Bolt Ball Grid Structure Main Supply

Views: 0     Author: Site Editor     Publish Time: 2024-12-10      Origin: Site

Inner Mongolia Huayi Zhuozi Thermal Power Co., Ltd. Coal Yard Dust Control Project Construction And Installation Section Name: Bolt Ball Grid Structure Main Supply

The closure project of the large power plant coal yard has an axis size of 255m (length) x 135m (span); Bolt ball grid structure with internal chord support. The coal shed support is placed on a 1.5m high concrete short column with a column spacing of 9m. Install coal retaining walls between columns; The bolted ball grid adopts an independent foundation with a burial depth of about 3m.

2

3

4

5

6

Jiangsu Lianfang Steel Structure Engineering Co., Ltd.
A comprehensive steel structure company integrating processing design, installation, and technical services.

About Lianfang

Is a comprehensive steel structure company integrating processing design, installation and technical services of grids, steel structures, pipe trusses and spherical grids.

Quick Links

Projects Category

Contact Us

Tel: +86-516-8505-5978
Email:  lianfangsteel@hotmail.com
Add: Dapeng Industrial Park, West Suburb, Xuzhou, Jiangsu
 
Leave a Message
CONTACT US
Copyright © 2024 Jiangsu Lianfang Steel Structure Engineering Co., Ltd. All Rights Reserved. SitemapPrivacy Policy